Provided build out of new site, including power plant, all overhead ladder & racking and cabling, secondary cabling, and batteries.
Included:
- Secure and anchor two plants in current position
- Installation of batteries in battery room
- Provide & installation of new battery cabling to each plant
Provide & installation of Auxiliary Ground bar near plant cabled from MGB
- Provide & installation of DC reference grounds for each plant & frame grounds
- Provide & installation of external return bus bar under floor for load returns
- Provide & installation new frame and ladder rack in new plant area
- Turn-up and test
Provided build out of new site, including power plant, all overhead ladder & racking and cabling, secondary cabling, and batteries.
Included:
- Secure and anchor two plants in current position
- Installation of batteries in battery room
- Provide & installation of new battery cabling to each plant
- Provide & installation of Auxiliary Ground bar near plant cabled from MGB
- Provide & installation of DC reference grounds for each plant & frame grounds
- Provide & installation of external return bus bar under floor for load returns
- Provide & installation new frame and ladder rack in new plant area
- Turn-up and test
Flooded Battery Replacement
- 2009 government project where MaeTec Power provided the installation services for (8) strings, with (120) C&D 2XTRC-25 Flooded Lead-Acid jars in each string. Installation of the battery strings were installed in a three tier rack and connection of battery monitoring system.
- Included the removal of existing batteries and racks and the proper disposal and certificate of disposal for all old batteries
Customer
BDFB was overloaded.
- Transitioned circuits to new BDFB in maintenance window to
balance load between the two.
- Identified
how many of the circuits needed to be transitioned over to the new BDFB
- Verified
how many of these circuits needed to be transitioned from various panels
- Once
the circuits were identified we notified the site contact of which circuits would
be moved so that they could monitor it during the transition.
192 Cell Battery Replacement with Alber Monitoring System
- Recently removed a 192 cell battery at a government facility in Alaska. Batteries were swollen and corroded. Removed and transported to smelter plant, providing customer with certified disposal certificates. Removed old anchors and studs which were severly corroded in place.